服務(wù)導(dǎo)航
Product categories
您當(dāng)前位置:首頁>工程動(dòng)態(tài)工程動(dòng)態(tài)
天花吊頂安裝手冊
發(fā)表時(shí)間:2017-01-20 11:35:25 發(fā)表作者:phpcms 瀏覽次數(shù):
軟膜天花安裝技巧
Soft film ceiling installation techniques
1、在安裝龍骨的時(shí)候,45度角盡可能的切準(zhǔn);龍骨不夠長,要拼接時(shí),龍骨要切平,不要有起拱。
1, in the installation of the keel, the 45 degree angle as far as possible the cutting; keel is not long enough to be spliced, keel to be flat, do not have arch.
2、安裝之前,要檢查清楚軟膜天花有沒有臟,那一面臟,清理干凈,這個(gè)還有很多人忽略的,然而軟膜天花吊頂安裝好了,才發(fā)現(xiàn)的話,不是要重新戲法拆裝嘛!
2, before installation, should check whether the soft film ceiling not dirty, it is dirty, clean it, there are a lot of people overlook, however piamater ceiling ceiling installation good, only to find it, not to trick you disassembly!
3、到安裝軟膜天花了,先要洗干凈手,然后安裝,軟膜天花不要掉到地下,這樣會(huì)搞臟軟膜,還有可能搞爛軟膜天花。
3, to the installation of soft film smallpox, to wash their hands, then install, soft film smallpox don't fall into the underground, it will get dirty and may mess up the soft, soft film smallpox.
4、安裝軟膜天花時(shí),龍骨的拼接的地方,要用輟平圓滑龍骨的尖角位置,再用紙膠布包一下,以免刺穿軟膜。
4, the installation of soft film smallpox, the keel of the splicing place, with sharp keel flat smooth stop position, and then glue cloth, so as not to pierce the mask.
5、安裝前要,準(zhǔn)備清潔劑,準(zhǔn)備膠水,以免修復(fù)清潔要用。上海軟膜天花吊頂
5, before installation, to prepare cleaning agent, prepare glue, so as to avoid the use of clean. Shanghai piamater ceiling
軟膜天花的安裝細(xì)節(jié):
Soft film ceiling installation details:
1、工地現(xiàn)場是否有條件安裝龍骨:現(xiàn)場墻身是否完成,木工部分加工是否合格,需要抹灰部分先完成。燈、風(fēng)口等開孔尺寸要提前加工好。
1, site installation site: whether the conditional keel wall is completed, woodworking processing part is qualified, need to complete part of plastering. Lamps, air vents and other openings to be processed in advance.
2、首先要按圖紙?jiān)O(shè)計(jì)要求的木工做好部分進(jìn)行固定鋁合金龍骨龍骨,注意角位一定要直角平整光滑,駁接要平、密。
2, first of all, according to the design requirements of the carpenter to do a good part of the fixed aluminum alloy keel, pay attention to the corner must be smooth and smooth, and then to be flat.
3、注意燈架、風(fēng)口、光管盤要與周邊的龍骨水平,并且要求牢固平穩(wěn)不能搖擺方可。
3, pay attention to the lamp holder, tuyere, light tube plate and the keel of the surrounding level, and the requirements of a firm and stable can not swing.
4、煙感、吸頂燈,先定位再做一個(gè)木底架,木底架底面要打磨光滑,并注意水平高度,太低就容易凸現(xiàn)底架的痕跡。
4, smoke, ceiling lamps, the first position to make a wooden frame wooden chassis underside to polish, and pay attention to the level of height is too low, it is easy to show a trace.
5、安裝天花之前,認(rèn)真檢查龍骨接頭是否牢固和光滑,噴淋頭要粘上白膠帶,風(fēng)口要處理好。安裝天花時(shí)要先從中間往兩邊固定,同時(shí)注意兩邊尺寸,注意焊接縫要直最后做角位,注意要平整光滑。四周做好后把多出的天花修剪去除。達(dá)到完美的收邊效果。
5, before the installation of smallpox, carefully check whether the keel joint is firm and smooth, spray head to stick on white tape, tuyere to handle. Installation of smallpox from the middle to both sides of the first fixed, while the attention of both sides of the size, pay attention to the last straight seam welding angle, pay attention to smooth. After more than four months to do more than the removal of smallpox pruning. To achieve the perfect edge effect.
6、開燈孔:在燈孔的位置上做好記號(hào),把PVC燈圈小心準(zhǔn)確地粘在軟膜的底面,待牢固后把多出的天花去除即可。
6, turn on the lights in the lamp hole hole: make a mark on the position of the PVC lamp ring carefully accurately glued to the bottom surface of film, to be strong after the removal of smallpox can be.
7、.開風(fēng)口、光管盤口:找到風(fēng)口光管盤口的位置,跟做四周一樣,把軟膜安裝到鋁合金龍骨上,注意角位要平整。做好后把多出的天花切除即可。
7. Open the tuyere, the light pipe handicap: find the outlet tube position position, like around the soft film mounted to Aluminum Alloy keel, note the angle should be smooth. After the completion of the smallpox can be removed.
8、最后用干凈毛巾清潔軟膜天花表面。
At the end of 8, with a clean towel to clean the surface of soft film smallpox.
以上這些如果能做到的話,做起事情來就順手很多了。
If these can be done, do things on a lot easier.
汝州市|
加查县|
巫山县|
北京市|
易门县|
民权县|
香港|
双城市|
南和县|
沛县|
洛浦县|
烟台市|
上高县|
宁陵县|
石河子市|
武平县|
平阴县|
克拉玛依市|
武城县|
正宁县|
廉江市|
公主岭市|
永春县|
东山县|
阿图什市|
田东县|
龙江县|
大邑县|
泰州市|
体育|
仲巴县|
亳州市|
左云县|
沂水县|
哈密市|
宁强县|
巧家县|
三亚市|
塔城市|
上杭县|
丰顺县|